CLRS will be installed where the speed limit is 45 MPH or greater, the pavement width is 14 feet in both directions, and the traffic volume exceeds 1500 vehicles per day. Shoulder berms that have built up will be removed to facilitate better drainage from the road surface, and some ditching work may be performed to further aid in drainage.The corridor will be evaluated for the installation of Centerline Rumble Strips (CLRS). Additionally, some guardrail work will be performed to repair and replaced damaged sections to bring full runs into compliance with the current standards. Project Description: Work on this project will consist of milling the pavement to a 1.5” depth, spot shimming and surface prepping, then paving with a 1.5” lift of Type IVS wearing course pavement. Project Location: Work will begin at the Massachusetts/Vermont boarder and will extend northerly along VT Route 112 for approximately 7.5 miles to the intersection of VT Route 112 and VT Route 100 in Whitingham. Resurfacing along VT 112 from Halifax ETE MM 0.0 to Whitingham ETE MM 7.45. HALIFAX-WHITINGHAM VT-112 STP FPAV(47) Halifax
0 Comments
Leave a Reply. |